What are the stages of a construction project? What is construction planning process? See full list on letsbuild. Normally, the conception of the project starts with the client. Depending on the project, the conception stage might vary.
It can take anywhere from a few days to a few months or more, depending on how imminent is the need for the completion of the project.
It goes without saying that construction workers usually don’t have much input during this stage, as the ball is still in the hands of the project owner. Once the project is closer to fruition, it is time to sit down and talk design. This is still a preliminary stage, which means that nothing is guaranteed at this point. Nevertheless, design is the stage where usually the bidding process begins. The team that is in charge of the design, led by an architect or an engineer, will need to make sure that each of the state regulations and codes is met while respecting the vision of the project owner as well as ensuring that the newly built structure will be usable.
There are normally four different steps within the design stage and they include programming and feasibility, schematic design, design development, and contract documents.